At a Glance

This project showcases a successful cylinder repair for the Metro Solid Waste Authority, which delivered significant cost savings. Despite encountering challenges due to the complexity and size of the equipment, our team delivered a high-quality repair at a fraction of the replacement cost (approximately 30%). Through innovative problem-solving, meticulous machining, and expert welding, we provided a cost-effective solution that met new specifications and exceeded customer expectations.

The Challenges

The Metro Solid Waste Authority faced a critical equipment failure. The cylinder experienced a rare and significant failure, likely a cracked body tube. This failure occurred within a facility with minimal downtime tolerance, creating a tight deadline for repairs. The repair itself presented several significant challenges:

  • Extensive Component Replacement: The repair scope included replacing most major components of the cylinder.
  • Design Modifications: Modifications were made to increase service life and minimize down time through field repairable components
  • Logistical Hurdles: The sheer size and complexity of the equipment posed logistical challenges for machining, assembly, and overall project execution.
  • Time Constraints: The need to minimize downtime for the waste authority added pressure.

The Solutions

Our team implemented a strategic and collaborative approach to address the complex repair challenges. The project involved a coordinated effort across various disciplines, including:

  • Skilled Machining: The team successfully machined the necessary components, overcoming the size limitations of the equipment through creative problem-solving.
  • Expert Welding: Welding expertise played a crucial role in ensuring the integrity of the repair.
  • Meticulous Assembly and Testing: The team disassembled, honed, assembled, and tested the repaired cylinder to ensure optimal performance.
  • Design Enhancements: Design modifications were made to improve future repairability and reduce the labor required for subsequent maintenance.

The Benefits

  • Significant Cost Savings: Reduced repair costs compared to replacement.
  • Minimized Downtime: Provided a readily available spare part, reducing operational disruptions.
  • Equipment Reliability: Ensured the continued operation of equipment.
Read More
Nov 15, 2025

Nothing Can Stop You Now

No Gaps.

With Certified Power Solutions, there are no gaps because you have everything you need in one place, from parts to prototyping to testing.

No Games.

With Certified Power Solutions, there are no games because you have a proactive partner who knows how much is at stake and will always follow through.

No Guesswork.

With Certified Power Solutions, there's no guesswork because you have a provider that brings real engineering expertise, from sales to support.